Purlins vs. Girts: Roof and Wall Secondary Framing Explained

Understand the different locations and duties of purlins and girts, then coordinate member marks, cladding interfaces, openings, and replacement requests.

By Nexus Building Components4 min readRecorded content date
Cutaway steel building showing roof purlins above and wall girts along the side elevation.
AI-generated concept illustration — Purlins support roof systems and girts support wall systems; similar profiles do not make them interchangeable.

Locate the member in the building

In a metal building, purlins support roof panels and girts support wall panels. These secondary members connect the cladding system to the primary framing. MBMA's educational material uses this roof-versus-wall distinction to explain how the building components fit together.

Names are most useful when tied to a location. A photograph of a loose C or Z section cannot reliably identify whether that piece belongs in a roof, wall, opening, or another framed condition. Record the member mark and the elevation or roof area first.

References: Metal building systems: components and secondary framing

Compare roof and wall coordination needs

The distinction changes the questions asked during a takeoff or replacement review. Use the table to build separate roof and wall material lists even when some profiles look alike.

Purlin and girt coordination checklist
TopicPurlinGirt
Primary locationRoof framingWall framing
Cladding interfaceRoof panel and roof attachment detailsWall panel and wall attachment details
Special conditionsRidge, eave, roof openings, and transitionsCorners, doors, windows, and wall transitions
Useful drawingRoof framing plan and sectionsWall elevations and framing details
Replacement recordRoof bay and piece markWall line, elevation, and piece mark

Treat secondary framing as part of the system

MBMA describes primary frames, secondary members, and cladding as interdependent components. The term secondary is a description of their place in the system, not a suggestion that changes are minor.

A new door opening is a good example. Removing a girt where the opening will go leaves questions about the surrounding members, jambs, cladding support, and connections. The useful next step is an opening-framing detail coordinated with the existing building, not a field decision to cut and reconnect the interrupted member.

References: Metal building systems and design resources

Capture orientation and support details

A component list should state which way each member faces and how it meets the supporting frame. Include lap or splice information where shown, together with holes and accessory connections. Identify conditions that differ at end bays, corners, and transitions.

When surveying existing work, take a wider image showing the member's position and a close image of each end connection. Add a sketch with the mark and viewing direction. This prevents a dimension or hole pattern from being interpreted backward when the replacement is discussed off site.

Build a practical replacement request

A replacement request needs more than a nominal depth. Organize what is known, what is measured, and what requires confirmation. If an existing marking is unreadable, say so; a guessed grade or thickness can create a false impression of certainty.

  • Identify the building area, bay, elevation, and member mark.
  • Provide the original drawing or manufacturer information where available.
  • Record profile geometry, length, coating, and readable markings.
  • Include support and splice details with orientation.
  • Describe attached cladding and any planned changes to it.
  • Keep the responsible designer's replacement decision with the purchase record.

Keep accessories with the right package

Separate roof accessories from wall accessories in the material schedule. Assign bridging, clips, closures, and opening pieces to the areas that need them rather than hiding them in a miscellaneous allowance. This helps the crew identify whether an incomplete delivery affects a specific area or the whole job.

If two suppliers divide the packages, record the interface responsibility. A clear list of who supplies each connection component is more useful than an assumption that it comes with the adjacent member.

Common questions

Are all purlins and girts cold-formed C or Z sections?

No. Those are common configurations, but the building design may use other members. Identify the actual specified section and its role rather than relying on a typical profile.

Can a spare roof purlin replace a damaged wall girt?

Not without a reviewed comparison of the member and its connections. Similar appearance or nominal depth does not establish compatibility with the wall system.

Sources & further reading

Use the current documentation for the exact product and project. Source links do not imply a partnership or endorsement.

Prepared with AI assistance. Linked references require current project-specific review. How these guides are prepared.

Products related to this guide

Explore the catalog references and compare the published options with your project documents. Products sharing a guide are not necessarily interchangeable.

Prepare a supply inquiry

  • Record the project drawing or detail and the specified product, profile, or system.
  • List the complete configuration, physical units, quantities, and cuts per piece.
  • Request current manufacturer documents; confirm compatibility, price, and availability before ordering.
  • Obtain the responsible professional's review for loads, code requirements, or installation.