
Hat Sections, Sub-Girts, Furring Zees, and Strapping
Identify HS-1, CS-1, SG-1, SG-2, furring zees, and strapping, then coordinate support planes, attachments, finishes, and material quantities.
Read the complete guideREFERENCE. COMPARE. PREPARE.
Browse by subject or search the entire library. View up to 20 guides per page.
Showing 261–266 of 266 guides

Identify HS-1, CS-1, SG-1, SG-2, furring zees, and strapping, then coordinate support planes, attachments, finishes, and material quantities.
Read the complete guide
Match jamb base, header-to-jamb, jamb-to-girt, and flange brace clips to part numbers, approved details, hardware, and installation locations.
Read the complete guide
Plan concealed fastener metal wall, soffit, liner, and canopy panels by approved application, support, finish face, joint access, and opening details.
Read the complete guide
Prepare a standing seam roof package with matched panels, clips, seaming equipment, support details, and installation review records before ordering.
Read the complete guide
Plan a Retro-R metal roof recover by checking the existing R-panel profile, structural condition, support attachment, penetrations, trim, and preparation scope.
Read the complete guide
Understand Drip Stop on PBR and MasterRib metal panels, including moisture release, edge preparation, dry storage, and the questions to resolve before ordering.
Read the complete guide